スケジュール情報

Position List

EUROPE

現在この地域の情報はありません。
Not Available.

ASIA / MIDDLE EAST

PACIFIC FORTITUDE

Built: 2007, DWT: 12,800
TWN, HO/HA: 3/3, Gear: 2x150t
Grain Total: 15,950cbm

PORT OPEN

Taicang

DATE OPEN

25/29 Sep

Direction Japan

PACIFIC ENDEAVOUR

Built: 2007, DWT: 12,800
TWN, HO/HA: 3/3, Gear: 2x120t
Grain Total: 15,950cbm

PORT OPEN

Tianjin
Penglai

DATE OPEN

22/26 Sep
28/30 Sep

Direction South East Aisa

KOKODA CHIEF

Built: 2011, DWT: 19,600
TWN, HO/HA: 3/3,  Gear: 2x240t
Grain Total: 20,000cbm

PORT OPEN

Taicang

DATE OPEN

02/06 Oct

Direction Intra Asia

PACIFIC EXCELLENCE

Built: 2007, DWT: 12,800
TWN, HO/HA: 3/3, Gear: 2x120t
Grain Total: 15,950cbm

PORT OPEN

Taicang
Kobe

DATE OPEN

15/20 Oct
23/26 Oct

Direction West Australia via South East Asia

PACIFIC FORTUNE

Built: 2008, DWT: 12,800
TWN, HO/HA: 3/3, Gear: 2x150t
Grain Total: 15,950cbm

PORT OPEN

Shanghai

DATE OPEN

22/24 Oct

Direction Any Direction Worldwide

KIETA CHIEF

Built: 2011, DWT: 19,600
TWN, HO/HA: 3/3,  Gear: 2x240t
Grain Total: 20,000cbm

PORT OPEN

Taicang

DATE OPEN

01/04 Nov

Direction Intra Asia

OCEANIA

PACIFIC FORTUNE

Built: 2008, DWT: 12,800
TWN, HO/HA: 3/3, Gear: 2x150t
Grain Total: 15,950cbm

PORT OPEN

Dampier

DATE OPEN

23/28 Sep

Direction North Asia

AMERICAS / NOPAC

現在この地域の情報はありません。
Not Available.

ATLANTIC

現在この地域の情報はありません。
Not Available.

AFRICA

現在この地域の情報はありません。
Not Available.

株式会社キーストン・ロジスティック KEYSTONE LOGISTIC, LTD.

〒104-0061
東京都中央区銀座1-24-3 Biz Feel GINZA PARK SIDE 3階

Tel03-3535-3567 Fax03-5579-9570

Email[email protected]